메뉴 건너뛰기

KIPCO

민수사업

임펠라  규격

임펠라

무제 문서

 

IMPELLER

APPLIED ITEMS

F110 AIR-FIGHTER ENGINE, APU ENGINE, COMPRESSOR

CAPACITY

400EA / MONTH

MANUFACTURING SIZE

Ø50- Ø2000

LEAD TIME

10 DAYS AFTER RECEIVING RAW MATERIAL

CUSTOMER

HANWHA AEROSPACE, POWER SYSTEM

임펠라 제작설비

MANUFACTURING PROCESS

ㆍRAW MATERIAL INSPECTION BEFORE MANUFACTURING

ㆍMEDEL VERIFICATION BEFORE MANUFACTURING USING SPECIAL PROGRAM

ㆍCMM INSPECTION AFTER MANUFACTURING BY SPECIALIZED INSPECTORS

ONLY 10DAYS NEEDED FOR MANUFACTURING EVEN SINGLE SPECIAL ORDER SPECIALIZED LABOR FORCES AND MACHINES